Query
Reunion Storage
Type
Entity Briefing
Entity
Reunion Storage
Generated
2026-10-19T06:16:29.030Z

Briefing on Reunion Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Reunion Storage is a 200 MW Solar+Battery project in Texas, currently active.

Reunion Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.

Queue ID
ERCOT-28INR0333
Location
Wilbarger, Texas
Technology
Solar+Battery
Developer
Reunion Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV #60504 Tesla Road to #6111 Riley

What stands out

1

Reunion Storage is a 200 MW Solar+Battery project in Texas with status active.

2

Reunion Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-07-01.

Market and operating context

Queue date
2025-03-24
Proposed COD
2028-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Reunion Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0333
LocationWilbarger, Texas
TechnologySolar+Battery
DeveloperReunion Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345kV #60504 Tesla Road to #6111 Riley
Queue date2025-03-24
Proposed COD2028-07-01