Reunion Solar is a 601 MW Solar+Battery project in Texas, currently active.
Reunion Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.
- Queue ID
- ERCOT-28INR0332
- Location
- Wilbarger, Texas
- Technology
- Solar+Battery
- Developer
- Reunion Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV #60504 Tesla Road to #6111 Riley
What stands out
1
Reunion Solar is a 601 MW Solar+Battery project in Texas with status active.
2
Reunion Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-07-01.
4
Latest linked story: “48-MW solar project built along Ohio River comes online” (Solar Power World, 2026-01-27).
Market and operating context
- Queue date
- 2025-03-24
- Proposed COD
- 2028-07-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.