Briefing/projectactive
Reid Energy Center is a 20 MW Battery project in Virginia, currently active.
Reid Energy Center, LLC is the reported developer. The reported queue phase is TC2. Proposed COD is 2022-12-23.
- Queue ID
- PJM-AH1-124
- Location
- Prince William, Virginia
- Technology
- Battery
- Developer
- Reid Energy Center, LLC
- Market / region
- PJM
- Point of interconnection
- Vint Hill 34.5kV
What stands out
1
Reid Energy Center is a 20 MW Battery project in Virginia with status active.
2
Reid Energy Center, LLC is the reported developer.
3
The reported queue phase is TC2; proposed COD is 2022-12-23.
Market and operating context
- Queue date
- 2025-02-20
- Proposed COD
- 2022-12-23
- IA status
- System Impact Study
- Study phase
- TC2
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.