Query
REDWOOD SOLAR FARM
Type
Entity Briefing
Entity
REDWOOD SOLAR FARM
Generated
2026-10-19T18:15:03.548Z

Briefing on REDWOOD SOLAR FARM

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
90 MW
Proposed capacity
active
Current status
Solar
Technology
CAISO
Market / region
2024-07-01
Proposed COD
C04
Queue phase
Briefing/projectactive

REDWOOD SOLAR FARM is a 90 MW Solar project in California, currently active.

The reported queue phase is C04. Proposed COD is 2024-07-01.

Queue ID
CAISO-744
Location
Kern, California
Technology
Solar
Market / region
CAISO
Point of interconnection
Lamont 115 KV

What stands out

1

REDWOOD SOLAR FARM is a 90 MW Solar project in California with status active.

2

The reported queue phase is C04; proposed COD is 2024-07-01.

Market and operating context

Queue date
2011-03-31
Proposed COD
2024-07-01
IA status
IA Executed
Study phase
C04
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

REDWOOD SOLAR FARM — verified asset snapshot

FieldValue
Queue IDCAISO-744
LocationKern, California
TechnologySolar
Market / regionCAISO
Point of interconnectionLamont 115 KV
Queue date2011-03-31
Proposed COD2024-07-01
IA statusIA Executed