Briefing/projectactive
RedSun Solar is a 83 MW Solar+Battery project in Texas, currently active.
Gransolar Texas Twenty Two is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-08-28.
- Queue ID
- ERCOT-27INR0124
- Location
- Burnet, Texas
- Technology
- Solar+Battery
- Developer
- Gransolar Texas Twenty Two
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 7100 Burnet - 7529 Bertram
What stands out
1
RedSun Solar is a 83 MW Solar+Battery project in Texas with status active.
2
Gransolar Texas Twenty Two is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-08-28.
Market and operating context
- Queue date
- 2023-12-04
- Proposed COD
- 2028-08-28
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.