Query
Red Holly Storage 1
Type
Entity Briefing
Entity
Red Holly Storage 1
Generated
2026-10-20T04:26:09.053Z

Briefing on Red Holly Storage 1

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
50 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-05-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Red Holly Storage 1 is a 50 MW Solar+Battery project in Texas, currently active.

GreenGo Energy is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-05-30.

Queue ID
ERCOT-21INR0029
Location
Dawson, Texas
Technology
Solar+Battery
Developer
GreenGo Energy
Market / region
ERCOT
Point of interconnection
tap 345kV 59900 Longdraw - 79641 Farmland

What stands out

1

Red Holly Storage 1 is a 50 MW Solar+Battery project in Texas with status active.

2

GreenGo Energy is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-05-30.

Market and operating context

Queue date
2018-07-11
Proposed COD
2028-05-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Red Holly Storage 1 — verified asset snapshot

FieldValue
Queue IDERCOT-21INR0029
LocationDawson, Texas
TechnologySolar+Battery
DeveloperGreenGo Energy
Market / regionERCOT
Point of interconnectiontap 345kV 59900 Longdraw - 79641 Farmland
Queue date2018-07-11
Proposed COD2028-05-30