Briefing/projectactive
Red Holly Solar is a 260 MW Solar+Battery project in Texas, currently active.
GreenGo Energy is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-09-30.
- Queue ID
- ERCOT-21INR0022
- Location
- Dawson, Texas
- Technology
- Solar+Battery
- Developer
- GreenGo Energy
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 59900 Longdraw - 79641 Farmland
What stands out
1
Red Holly Solar is a 260 MW Solar+Battery project in Texas with status active.
2
GreenGo Energy is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2029-09-30.
Market and operating context
- Queue date
- 2018-07-11
- Proposed COD
- 2029-09-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.