Briefing/plantPlanned
Red Hollow Renewable Energy is a 600 MW Batteries asset in ERCOT (Texas), currently Planned.
Red Hollow Renewable Energy is reported in Texas under Vesper Energy Development LLC. Available operating and financial measures include $1543/kW reported CapEx.
- Location
- Archer, Texas
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Vesper Energy Development LLC
- Operator
- Vesper Energy Development LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 68030
What stands out
1
Red Hollow Renewable Energy is a 600 MW Batteries asset in Texas with status Planned.
2
Available financial measures include $1543/kW CapEx.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #8 of 344
- National rank
- #35 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.