Briefing on Rattlesnake Gap Wind SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2029-06-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Rattlesnake Gap Wind SLF is a 200 MW Wind project in Texas, currently active.

ET Fuels US Inc. is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-01.

Queue ID
ERCOT-29INR0177
Location
Howard, Texas
Technology
Wind
Developer
ET Fuels US Inc.
Market / region
ERCOT
Point of interconnection
10119 Tributary Switch 138 kV

What stands out

1

Rattlesnake Gap Wind SLF is a 200 MW Wind project in Texas with status active.

2

ET Fuels US Inc. is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-06-01.

Market and operating context

Queue date
2025-09-22
Proposed COD
2029-06-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Rattlesnake Gap Wind SLF — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0177
LocationHoward, Texas
TechnologyWind
DeveloperET Fuels US Inc.
Market / regionERCOT
Point of interconnection10119 Tributary Switch 138 kV
Queue date2025-09-22
Proposed COD2029-06-01