Briefing/projectactive
Rattlesnake Gap Solar SLF is a 93 MW Solar+Battery project in Texas, currently active.
ET Fuels US Inc. is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-01.
- Queue ID
- ERCOT-29INR0178
- Location
- Howard, Texas
- Technology
- Solar+Battery
- Developer
- ET Fuels US Inc.
- Market / region
- ERCOT
- Point of interconnection
- 10119 Tributary Switch 138 kV
What stands out
1
Rattlesnake Gap Solar SLF is a 93 MW Solar+Battery project in Texas with status active.
2
ET Fuels US Inc. is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-06-01.
Market and operating context
- Queue date
- 2025-09-22
- Proposed COD
- 2029-06-01
- IA status
- Facility Study
- Study phase
- Facility Study