Query
Ratcliff Solar Park
Type
Entity Briefing
Entity
Ratcliff Solar Park
State
AR
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Ratcliff Solar Park

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

79 MW
Capacity
Planned
Current status
1
Generators
Briefing/plantPlanned

Ratcliff Solar Park is a 79 MW Solar Photovoltaic asset in ERCOT (Texas), currently Planned.

Ratcliff Solar Park is reported in Texas under Greenalia Solar Power Ratcliff, LLC. Available operating and financial measures include $1543/kW reported CapEx.

Location
Freestone, Texas
Technology
Solar Photovoltaic
Owner / parent
Greenalia Solar Power Ratcliff, LLC
Operator
Greenalia Solar Power Ratcliff, LLC
Grid
ERCOT (Texas)
Plant ID
67563

What stands out

1

Ratcliff Solar Park is a 79 MW Solar Photovoltaic asset in Texas with status Planned.

2

Available financial measures include $1543/kW CapEx.

3

1 linked queue projects represent 86 MW of proposed capacity.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#270 of 378
National rank
#1026 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Ratcliff Solar Park — verified asset snapshot

FieldValue
LocationFreestone, Texas
TechnologySolar Photovoltaic
Owner / parentGreenalia Solar Power Ratcliff, LLC
OperatorGreenalia Solar Power Ratcliff, LLC
GridERCOT (Texas)
Plant ID67563
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.