Briefing on Ratcliff Solar

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
86 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-04-07
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Ratcliff Solar is a 86 MW Solar project in Texas, currently active.

Greenalia Solar Power Ratcliff is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-07.

Queue ID
ERCOT-24INR0289
Location
Freestone, Texas
Technology
Solar
Developer
Greenalia Solar Power Ratcliff
Market / region
ERCOT
Point of interconnection
Tap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake

What stands out

1

Ratcliff Solar is a 86 MW Solar project in Texas with status active.

2

Greenalia Solar Power Ratcliff is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-04-07.

4

Latest linked story: “Palomino Solar Project detailed” (The Times Gazette, 2025-03-05).

Market and operating context

Queue date
2022-06-27
Proposed COD
2029-04-07
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Ratcliff Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0289
LocationFreestone, Texas
TechnologySolar
DeveloperGreenalia Solar Power Ratcliff
Market / regionERCOT
Point of interconnectionTap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake
Queue date2022-06-27
Proposed COD2029-04-07