Briefing/projectactive
Ratcliff Solar is a 86 MW Solar project in Texas, currently active.
Greenalia Solar Power Ratcliff is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-07.
- Queue ID
- ERCOT-24INR0289
- Location
- Freestone, Texas
- Technology
- Solar
- Developer
- Greenalia Solar Power Ratcliff
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake
What stands out
1
Ratcliff Solar is a 86 MW Solar project in Texas with status active.
2
Greenalia Solar Power Ratcliff is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-04-07.
4
Latest linked story: “Palomino Solar Project detailed” (The Times Gazette, 2025-03-05).
Market and operating context
- Queue date
- 2022-06-27
- Proposed COD
- 2029-04-07
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.