Radiant Plains Energy Center BESS is a 100 MW Solar+Battery project in Texas, currently active.
Adapture Solar Development is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-27.
- Queue ID
- ERCOT-30INR0045
- Location
- Colorado, Texas
- Technology
- Solar+Battery
- Developer
- Adapture Solar Development
- Market / region
- ERCOT
- Point of interconnection
- 7254 Weimar 138 kV
What stands out
1
Radiant Plains Energy Center BESS is a 100 MW Solar+Battery project in Texas with status active.
2
Adapture Solar Development is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-12-27.
Market and operating context
- Queue date
- 2025-06-12
- Proposed COD
- 2029-12-27
- IA status
- Facility Study
- Study phase
- Facility Study