342 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Rabbit Hollow Energy Storage is a 342 MW Battery project in Texas, currently active.

Rabbit Hollow Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-30.

Queue ID
ERCOT-28INR0119
Location
Mitchell, Texas
Technology
Battery
Developer
Rabbit Hollow Energy Storage, LLC
Market / region
ERCOT
Point of interconnection
1190 Barber Lake Switch 138kV

What stands out

1

Rabbit Hollow Energy Storage is a 342 MW Battery project in Texas with status active.

2

Rabbit Hollow Energy Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-30.

Market and operating context

Queue date
2024-12-19
Proposed COD
2028-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Rabbit Hollow Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0119
LocationMitchell, Texas
TechnologyBattery
DeveloperRabbit Hollow Energy Storage, LLC
Market / regionERCOT
Point of interconnection1190 Barber Lake Switch 138kV
Queue date2024-12-19