Query
Quinto Solar PV Project
Type
Entity Briefing
Entity
Quinto Solar PV Project
Technology
solar
Generated
2026-10-17T15:37:28.123Z

Briefing on Quinto Solar PV Project

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
108 MW
Capacity
Operating
Current status
2015
Operating since
1
Generators
27.1%
Capacity factor
257 GWh
Annual generation
Briefing/plantOperating

Quinto Solar PV Project is a 108 MW Solar Photovoltaic asset in CAISO (California), currently Operating.

Quinto Solar PV Project is reported in California since 2015 under Arevon Energy, Inc.. Available operating and financial measures include 27.1% capacity factor and 257 GWh annual generation; $24.7/MWh reported energy value.

Location
Merced, California
Technology
Solar Photovoltaic
Owner / parent
Arevon Energy, Inc.
Operator
Arevon Energy, Inc.
Grid
CAISO (California)
Plant ID
59339

What stands out

1

Quinto Solar PV Project is a 108 MW Solar Photovoltaic asset in California with status Operating.

2

Latest annual operating measures report 27.1% capacity factor and 257 GWh annual generation.

3

Available financial measures include $24.7/MWh energy value.

4

Latest linked story: “Leading Renewables Developer Arevon Selects Bechtel to Deliver Its Newest Solar Project” (Bechtel, 2025-02-22).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#106 of 992
National rank
#763 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.