Query
Quinebaug Lower Project
Type
Entity Briefing
Entity
Quinebaug Lower Project
Generated
2026-10-17T13:34:33.797Z

Briefing on Quinebaug Lower Project

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
1990
Operating since
4
Generators
29.2%
Capacity factor
6 GWh
Annual generation
Briefing/plantOperating

Quinebaug Lower Project is a 3 MW Conventional Hydroelectric asset in ISO New England, currently Operating.

Quinebaug Lower Project is reported in Connecticut since 1990 under Quinebaug Associates LLC. Available operating and financial measures include 29.2% capacity factor and 6 GWh annual generation; $2294/kW reported CapEx.

Location
Windham, Connecticut
Technology
Conventional Hydroelectric
Owner / parent
Quinebaug Associates LLC
Operator
Quinebaug Associates LLC
Grid
ISO New England
Plant ID
55860

What stands out

1

Quinebaug Lower Project is a 3 MW Conventional Hydroelectric asset in Connecticut with status Operating.

2

Latest annual operating measures report 29.2% capacity factor and 6 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#10 of 14
National rank
#1136 of 1,462

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.