Query
PUMPJACK SOLAR I (AKA PIONEER SOLAR I)
Type
Entity Briefing
Entity
PUMPJACK SOLAR I (AKA PIONEER SOLAR I)
Generated
2026-10-06T12:08:13.422Z

Briefing on PUMPJACK SOLAR I (AKA PIONEER SOLAR I)

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
40 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2027-06-01
Proposed COD
SGIP-TC
Queue phase
Briefing/projectactive

PUMPJACK SOLAR I (AKA PIONEER SOLAR I) is a 40 MW Solar+Battery project in California, currently active.

The reported queue phase is SGIP-TC. Proposed COD is 2027-06-01.

Queue ID
CAISO-653B
Location
Kern, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Belridge - Temblor 115 kV

What stands out

1

PUMPJACK SOLAR I (AKA PIONEER SOLAR I) is a 40 MW Solar+Battery project in California with status active.

2

The reported queue phase is SGIP-TC; proposed COD is 2027-06-01.

Market and operating context

Queue date
2010-09-29
Proposed COD
2027-06-01
IA status
IA Executed
Study phase
SGIP-TC
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

PUMPJACK SOLAR I (AKA PIONEER SOLAR I) — verified asset snapshot

FieldValue
Queue IDCAISO-653B
LocationKern, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionBelridge - Temblor 115 kV
Queue date2010-09-29
Proposed COD2027-06-01
IA statusIA Executed