Pulaski Energy Storage is a 135 MW Battery project in Maryland, currently active.
Pulaski Energy Storage LLC is the reported developer. The reported queue phase is TC2. Proposed COD is 2025-06-30.
- Queue ID
- PJM-AH1-261
- Location
- Baltimore, Maryland
- Technology
- Battery
- Developer
- Pulaski Energy Storage LLC
- Market / region
- PJM
- Point of interconnection
- Northeast - Riverside 230 kV
What stands out
1
Pulaski Energy Storage is a 135 MW Battery project in Maryland with status active.
2
Pulaski Energy Storage LLC is the reported developer.
3
The reported queue phase is TC2; proposed COD is 2025-06-30.
Market and operating context
- Queue date
- 2025-02-20
- Proposed COD
- 2025-06-30
- IA status
- System Impact Study
- Study phase
- TC2
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.