Pulaski Energy Storage
Type
Entity Briefing
Entity
Pulaski Energy Storage
Generated
2026-10-05T14:53:22.977Z

Briefing on Pulaski Energy Storage

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
135 MW
Proposed capacity
active
Current status
Battery
Technology
PJM
Market / region
2025-06-30
Proposed COD
TC2
Queue phase
Briefing/projectactive

Pulaski Energy Storage is a 135 MW Battery project in Maryland, currently active.

Pulaski Energy Storage LLC is the reported developer. The reported queue phase is TC2. Proposed COD is 2025-06-30.

Queue ID
PJM-AH1-261
Location
Baltimore, Maryland
Technology
Battery
Developer
Pulaski Energy Storage LLC
Market / region
PJM
Point of interconnection
Northeast - Riverside 230 kV

What stands out

1

Pulaski Energy Storage is a 135 MW Battery project in Maryland with status active.

2

Pulaski Energy Storage LLC is the reported developer.

3

The reported queue phase is TC2; proposed COD is 2025-06-30.

Market and operating context

Queue date
2025-02-20
Proposed COD
2025-06-30
IA status
System Impact Study
Study phase
TC2
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pulaski Energy Storage — verified asset snapshot

FieldValue
Queue IDPJM-AH1-261
LocationBaltimore, Maryland
TechnologyBattery
DeveloperPulaski Energy Storage LLC
Market / regionPJM
Point of interconnectionNortheast - Riverside 230 kV
Queue date2025-02-20
Proposed COD2025-06-30