Briefing on PUFF HYBRID SOLAR

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
204 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2030-09-01
Proposed COD
C13
Queue phase
Briefing/projectactive

PUFF HYBRID SOLAR is a 204 MW Solar+Battery project in California, currently active.

The reported queue phase is C13. Proposed COD is 2030-09-01.

Queue ID
CAISO-1740
Location
Kern, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Arco 230 kV

What stands out

1

PUFF HYBRID SOLAR is a 204 MW Solar+Battery project in California with status active.

2

The reported queue phase is C13; proposed COD is 2030-09-01.

Market and operating context

Queue date
2020-04-15
Proposed COD
2030-09-01
IA status
System Impact Study
Study phase
C13
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

PUFF HYBRID SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-1740
LocationKern, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionArco 230 kV
Queue date2020-04-15
Proposed COD2030-09-01
IA statusSystem Impact Study