Query
Pueblo BA
Type
Entity Briefing
Entity
Pueblo BA
Generated
2026-10-18T02:38:07.379Z

Briefing on Pueblo BA

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
20 MW
Capacity
Operating
Current status
2022
Operating since
2
Generators
-0.8%
Capacity factor
-1 GWh
Annual generation
Briefing/plantOperating

Pueblo BA is a 20 MW Batteries asset in ERCOT (Texas), currently Operating.

Pueblo BA is reported in Texas since 2022 under ENGIE. Available operating and financial measures include -0.8% capacity factor and -1 GWh annual generation; $1205/kW reported CapEx.

Location
Maverick, Texas
Technology
Batteries
Owner / parent
ENGIE
Operator
Engie North America
Grid
ERCOT (Texas)
Plant ID
64318

What stands out

1

Pueblo BA is a 20 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report -0.8% capacity factor and -1 GWh annual generation.

3

Available financial measures include $1205/kW CapEx.

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#202 of 344
National rank
#548 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.