Query
Proxima
Type
Entity Briefing
Entity
Proxima
Generated
2026-10-17T07:13:46.589Z

Briefing on Proxima

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
352 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
15.0%
Capacity factor
464 GWh
Annual generation
Briefing/plantOperating

Proxima is a 352 MW Batteries asset in CAISO (California), currently Operating.

Proxima is reported in California since 2024 under NextEra Energy. Available operating and financial measures include 15.0% capacity factor and 464 GWh annual generation.

Location
Stanislaus, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Proxima Solar, LLC
Grid
CAISO (California)
Plant ID
66270

What stands out

1

Proxima is a 352 MW Batteries asset in California with status Operating.

2

Latest annual operating measures report 15.0% capacity factor and 464 GWh annual generation.

3

Latest linked story: “Delta Tunnel plan touted by Newsom gets push-back from Congress member” (capradio.org, 2023-05-24).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#21 of 992
National rank
#102 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.