Query
Prospect 2
Type
Entity Briefing
Entity
Prospect 2
Generated
2026-10-17T16:22:09.610Z

Briefing on Prospect 2

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
32 MW
Capacity
Operating
Current status
1928
Operating since
2
Generators
68.6%
Capacity factor
193 GWh
Annual generation
Briefing/plantOperating

Prospect 2 is a 32 MW Conventional Hydroelectric asset in Oregon, currently Operating.

Prospect 2 is reported in Oregon since 1928 under Berkshire Hathaway. Available operating and financial measures include 68.6% capacity factor and 193 GWh annual generation.

Location
Jackson, Oregon
Technology
Conventional Hydroelectric
Owner / parent
Berkshire Hathaway
Operator
PacifiCorp
Grid
PacifiCorp - West
Plant ID
3033

What stands out

1

Prospect 2 is a 32 MW Conventional Hydroelectric asset in Oregon with status Operating.

2

Latest annual operating measures report 68.6% capacity factor and 193 GWh annual generation.

3

Latest linked story: “Utahns deserve lower bills, not higher profits for PacifiCorp” (Utah News Dispatch, 2025-10-28).

Market and operating context

Balancing authority
PacifiCorp - West
NERC region
WECC
State rank
#19 of 63
National rank
#392 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.