Query
Priddy Wind
Type
Entity Briefing
Entity
Priddy Wind
Generated
2026-10-18T05:27:00.424Z

Briefing on Priddy Wind

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
302 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2026-12-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Priddy Wind is a 302 MW Wind project in Texas, currently active.

Engie North America is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-12-31.

Queue ID
ERCOT-16INR0085
Location
Mills, Texas
Technology
Wind
Developer
Engie North America
Market / region
ERCOT
Point of interconnection
tap 345kV 1444 Brown – 3422 Killeen

What stands out

1

Priddy Wind is a 302 MW Wind project in Texas with status active.

2

Engie North America is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-12-31.

4

Latest linked story: “Burckhardt Compression Decarbonizes US Operations” (Gas Compression Magazine, 2024-07-03).

Market and operating context

Queue date
2015-01-14
Proposed COD
2026-12-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Priddy Wind — verified asset snapshot

FieldValue
Queue IDERCOT-16INR0085
LocationMills, Texas
TechnologyWind
DeveloperEngie North America
Market / regionERCOT
Point of interconnectiontap 345kV 1444 Brown – 3422 Killeen
Queue date2015-01-14
Proposed COD2026-12-31