Briefing/projectactive
Pradera Storage is a 153 MW Solar+Battery project in Texas, currently active.
Pradera Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-23.
- Queue ID
- ERCOT-23INR0183
- Location
- Webb, Texas
- Technology
- Solar+Battery
- Developer
- Pradera Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345 kV Lobo 80219 - Fowlerton 5709 ckt #2
What stands out
1
Pradera Storage is a 153 MW Solar+Battery project in Texas with status active.
2
Pradera Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-06-23.
Market and operating context
- Queue date
- 2021-01-25
- Proposed COD
- 2029-06-23
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.