Query
Post Trail Energy
Type
Entity Briefing
Entity
Post Trail Energy
Generated
2026-10-12T04:06:05.180Z

Briefing on Post Trail Energy

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
104 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-10-16
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Post Trail Energy is a 104 MW Battery project in Texas, currently active.

Post Trail Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-16.

Queue ID
ERCOT-26INR0429
Location
Matagorda, Texas
Technology
Battery
Developer
Post Trail Energy, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV Conoco 8138 - Black Cat 80124

What stands out

1

Post Trail Energy is a 104 MW Battery project in Texas with status active.

2

Post Trail Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-10-16.

4

Latest linked story: “California battery project in limbo amid local opposition” (E&E News by POLITICO, 2025-04-14).

Market and operating context

Queue date
2024-09-10
Proposed COD
2028-10-16
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Post Trail Energy — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0429
LocationMatagorda, Texas
TechnologyBattery
DeveloperPost Trail Energy, LLC
Market / regionERCOT
Point of interconnectionTap 138kV Conoco 8138 - Black Cat 80124
Queue date2024-09-10
Proposed COD2028-10-16