Post Trail Energy is a 104 MW Battery project in Texas, currently active.
Post Trail Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-10-16.
- Queue ID
- ERCOT-26INR0429
- Location
- Matagorda, Texas
- Technology
- Battery
- Developer
- Post Trail Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV Conoco 8138 - Black Cat 80124
What stands out
Post Trail Energy is a 104 MW Battery project in Texas with status active.
Post Trail Energy, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-10-16.
Latest linked story: “California battery project in limbo amid local opposition” (E&E News by POLITICO, 2025-04-14).
Market and operating context
- Queue date
- 2024-09-10
- Proposed COD
- 2028-10-16
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.