Port Leyden Hydroelectric Project is a 1 MW Conventional Hydroelectric asset in NYISO (New York), currently Operating.
Port Leyden Hydroelectric Project is reported in New York since 1985 under Lyonsdale Hydroelectric Co., Inc.. Available operating and financial measures include 53.9% capacity factor and 5 GWh annual generation; $2294/kW reported CapEx.
- Location
- Lewis, New York
- Technology
- Conventional Hydroelectric
- Owner / parent
- Lyonsdale Hydroelectric Co., Inc.
- Operator
- Lyonsdale Hydroelectric Co., Inc.
- Grid
- NYISO (New York)
- Plant ID
- 10817
What stands out
Port Leyden Hydroelectric Project is a 1 MW Conventional Hydroelectric asset in New York with status Operating.
Latest annual operating measures report 53.9% capacity factor and 5 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- NYISO (New York)
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
- State rank
- #165 of 165
- National rank
- #1439 of 1,462
Why it matters
For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.