Briefing on Poco Trail Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
439 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-05-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Poco Trail Solar is a 439 MW Solar project in Texas, currently active.

Eastern Trail Solar Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-01.

Queue ID
ERCOT-23INR0273
Location
Wilbarger, Texas
Technology
Solar
Developer
Eastern Trail Solar Center, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 6101 Riley - 1422 Bowman Byrd Road Switch

What stands out

1

Poco Trail Solar is a 439 MW Solar project in Texas with status active.

2

Eastern Trail Solar Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-05-01.

Market and operating context

Queue date
2021-09-14
Proposed COD
2027-05-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Poco Trail Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0273
LocationWilbarger, Texas
TechnologySolar
DeveloperEastern Trail Solar Center, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 6101 Riley - 1422 Bowman Byrd Road Switch
Queue date2021-09-14
Proposed COD2027-05-01