Briefing/projectactive
Poco Trail Solar is a 439 MW Solar project in Texas, currently active.
Eastern Trail Solar Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-01.
- Queue ID
- ERCOT-23INR0273
- Location
- Wilbarger, Texas
- Technology
- Solar
- Developer
- Eastern Trail Solar Center, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 6101 Riley - 1422 Bowman Byrd Road Switch
What stands out
1
Poco Trail Solar is a 439 MW Solar project in Texas with status active.
2
Eastern Trail Solar Center, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-05-01.
Market and operating context
- Queue date
- 2021-09-14
- Proposed COD
- 2027-05-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.