Plant Road BESS is a 206 MW Battery project in Texas, currently active.
Horizon Energy Storage Greenfield Project Holdings LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-03-01.
- Queue ID
- ERCOT-27INR0343
- Location
- Ector, Texas
- Technology
- Battery
- Developer
- Horizon Energy Storage Greenfield Project Holdings LLC
- Market / region
- ERCOT
- Point of interconnection
- 1027 ODEHV 138kV
What stands out
Plant Road BESS is a 206 MW Battery project in Texas with status active.
Horizon Energy Storage Greenfield Project Holdings LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-03-01.
Latest linked story: “Enel completes 556-MW solar array co-located at operational 355-MW BESS” (Solar Power World, 2025-11-06).
Market and operating context
- Queue date
- 2024-10-10
- Proposed COD
- 2028-03-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.