Briefing/projectactive
Pink Storage SLF is a 0 MW Battery project in Texas, currently active.
Pink Solar, LLC is the reported developer. Proposed COD is 2029-07-31.
- Queue ID
- ERCOT-29INR0293
- Location
- Hunt, Texas
- Technology
- Battery
- Developer
- Pink Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- 971 Pruitt 138kV
What stands out
1
Pink Storage SLF is a 0 MW Battery project in Texas with status active.
2
Pink Solar, LLC is the reported developer.
3
proposed COD is 2029-07-31.
Market and operating context
- Queue date
- 2026-02-26
- Proposed COD
- 2029-07-31
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.