Query
Pinewood Solar
Type
Entity Briefing
Entity
Pinewood Solar
Generated
2026-10-19T06:45:01.198Z

Briefing on Pinewood Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
151 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-04-14
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Pinewood Solar is a 151 MW Solar project in Texas, currently active.

Brazoria Solar II, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-04-14.

Queue ID
ERCOT-25INR0170
Location
Brazoria, Texas
Technology
Solar
Developer
Brazoria Solar II, LLC
Market / region
ERCOT
Point of interconnection
43020 Seabreeze 345kV

What stands out

1

Pinewood Solar is a 151 MW Solar project in Texas with status active.

2

Brazoria Solar II, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-04-14.

Market and operating context

Queue date
2022-09-02
Proposed COD
2028-04-14
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pinewood Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0170
LocationBrazoria, Texas
TechnologySolar
DeveloperBrazoria Solar II, LLC
Market / regionERCOT
Point of interconnection43020 Seabreeze 345kV
Queue date2022-09-02
Proposed COD2028-04-14