Query
Pima Community College - East Campus
Type
Entity Briefing
Entity
Pima Community College - East Campus
Summary generated
Oct 18, 2026
First saved
Date not recorded

Briefing on Pima Community College - East Campus

Entity Briefing

Summary generated Oct 18, 2026 (UTC).

Source dates used by this summary were not recorded.

1 MW
Capacity
Operating
Current status
2017
Operating since
1
Generators
24.3%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Pima Community College - East Campus is a 1 MW Solar Photovoltaic asset in Arizona, currently Operating.

Pima Community College - East Campus is reported in Arizona since 2017 under Tesla Inc.. Available operating and financial measures include 24.3% capacity factor and 3 GWh annual generation; $14.8/MWh reported energy value.

Location
Pima, Arizona
Technology
Solar Photovoltaic
Owner / parent
Tesla Inc.
Operator
Tesla Inc.
Grid
Tucson Electric Power Company
Plant ID
61104

What stands out

1

Pima Community College - East Campus is a 1 MW Solar Photovoltaic asset in Arizona with status Operating.

2

Latest annual operating measures report 24.3% capacity factor and 3 GWh annual generation.

3

Available financial measures include $14.8/MWh energy value.

Market and operating context

Balancing authority
Tucson Electric Power Company
NERC region
WECC
State rank
#98 of 110
National rank
#6866 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.