Pigeon Run Solar and Storage is a 60 MW Solar project in Virginia, currently active.
Hanwha is the reported developer. The reported queue phase is TC1. Proposed COD is 2031-03-01.
- Queue ID
- PJM-AE2-185
- Location
- Campbell, Virginia
- Technology
- Solar
- Developer
- Hanwha
- Market / region
- PJM
- Point of interconnection
- Gladys DP-Stonemill Switching Station 69 kV
What stands out
1
Pigeon Run Solar and Storage is a 60 MW Solar project in Virginia with status active.
2
Hanwha is the reported developer.
3
The reported queue phase is TC1; proposed COD is 2031-03-01.
4
Latest linked story: “Campbell County leaders approve solar farm site off Brookneal Highway” (WSET, 2026-02-28).
Market and operating context
- Queue date
- 2019-03-18
- Proposed COD
- 2031-03-01
- IA status
- IA Executed
- Study phase
- TC1
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.