Query
Pickwick Landing Dam
Type
Entity Briefing
Entity
Pickwick Landing Dam
Generated
2026-10-17T11:53:45.217Z

Briefing on Pickwick Landing Dam

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
240 MW
Capacity
Operating
Current status
1938
Operating since
6
Generators
59.7%
Capacity factor
1259 GWh
Annual generation
Briefing/plantOperating

Pickwick Landing Dam is a 240 MW Conventional Hydroelectric asset in Tennessee, currently Operating.

Pickwick Landing Dam is reported in Tennessee since 1938 under Tennessee Valley Authority. Available operating and financial measures include 59.7% capacity factor and 1259 GWh annual generation; $2294/kW reported CapEx.

Location
Hardin, Tennessee
Technology
Conventional Hydroelectric
Owner / parent
Tennessee Valley Authority
Operator
Tennessee Valley Authority
Grid
Tennessee Valley Authority
Plant ID
3415

What stands out

1

Pickwick Landing Dam is a 240 MW Conventional Hydroelectric asset in Tennessee with status Operating.

2

Latest annual operating measures report 59.7% capacity factor and 1259 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “DOE Awards Holtec, TVA $800M to Build Pioneering SMRs” (RTO Insider, 2025-12-02).

Market and operating context

Balancing authority
Tennessee Valley Authority
NERC region
SERC
State rank
#2 of 29
National rank
#83 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.