Briefing on PHOTO BESS 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
75 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-09-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

PHOTO BESS 1 is a 75 MW Solar+Battery project in Texas, currently active.

CED Development Inc. is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-01.

Queue ID
ERCOT-24INR0121
Location
Uvalde, Texas
Technology
Solar+Battery
Developer
CED Development Inc.
Market / region
ERCOT
Point of interconnection
5885 Downie 138kV

What stands out

1

PHOTO BESS 1 is a 75 MW Solar+Battery project in Texas with status active.

2

CED Development Inc. is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-01.

Market and operating context

Queue date
2021-10-29
Proposed COD
2027-09-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

PHOTO BESS 1 — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0121
LocationUvalde, Texas
TechnologySolar+Battery
DeveloperCED Development Inc.
Market / regionERCOT
Point of interconnection5885 Downie 138kV
Queue date2021-10-29
Proposed COD2027-09-01