Briefing/projectactive
Pez Rojo BESS is a 217 MW Battery project in Texas, currently active.
Pez Rojo BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-02-01.
- Queue ID
- ERCOT-27INR0245
- Location
- Harris, Texas
- Technology
- Battery
- Developer
- Pez Rojo BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV #40260 Chamon - #40912 King
What stands out
1
Pez Rojo BESS is a 217 MW Battery project in Texas with status active.
2
Pez Rojo BESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-02-01.
Market and operating context
- Queue date
- 2024-07-01
- Proposed COD
- 2029-02-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.