Query
Perry Solar Facility
Type
Entity Briefing
Entity
Perry Solar Facility
Summary generated
Oct 9, 2026
First saved
Date not recorded

Briefing on Perry Solar Facility

Entity Briefing

Summary generated Oct 9, 2026 (UTC).

Source dates used by this summary were not recorded.

5 MW
Capacity
Operating
Current status
2016
Operating since
1
Generators
17.1%
Capacity factor
8 GWh
Annual generation
Briefing/plantOperating

Perry Solar Facility is a 5 MW Solar Photovoltaic asset in Florida, currently Operating.

Perry Solar Facility is reported in Florida since 2016 under Duke Energy. Available operating and financial measures include 17.1% capacity factor and 8 GWh annual generation.

Location
Taylor, Florida
Technology
Solar Photovoltaic
Owner / parent
Duke Energy
Operator
Duke Energy Florida, LLC
Grid
Progress Energy Florida
Plant ID
60071

What stands out

1

Perry Solar Facility is a 5 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 17.1% capacity factor and 8 GWh annual generation.

3

Latest linked story: “Utility giant Duke Energy plans to spend industry record $103 billion on growth as data centers boom” (Fortune, 2026-04-28).

Market and operating context

Balancing authority
Progress Energy Florida
NERC region
SERC
State rank
#208 of 237
National rank
#2619 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.