Query
Perry Solar Facility
Type
Entity Briefing
Entity
Perry Solar Facility
Generated
2026-10-09T08:06:04.090Z

Briefing on Perry Solar Facility

Entity Briefing
Generated Oct 9, 2026·Dataset freshness not reported
5 MW
Capacity
Operating
Current status
2016
Operating since
1
Generators
17.1%
Capacity factor
8 GWh
Annual generation
Briefing/plantOperating

Perry Solar Facility is a 5 MW Solar Photovoltaic asset in Florida, currently Operating.

Perry Solar Facility is reported in Florida since 2016 under Duke Energy. Available operating and financial measures include 17.1% capacity factor and 8 GWh annual generation.

Location
Taylor, Florida
Technology
Solar Photovoltaic
Owner / parent
Duke Energy
Operator
Duke Energy Florida, LLC
Grid
Progress Energy Florida
Plant ID
60071

What stands out

1

Perry Solar Facility is a 5 MW Solar Photovoltaic asset in Florida with status Operating.

2

Latest annual operating measures report 17.1% capacity factor and 8 GWh annual generation.

3

Latest linked story: “Utility giant Duke Energy plans to spend industry record $103 billion on growth as data centers boom” (Fortune, 2026-04-28).

Market and operating context

Balancing authority
Progress Energy Florida
NERC region
SERC
State rank
#208 of 237
National rank
#2619 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.