Percy Farm Solar is a 199 MW Solar project in Texas, currently active.
Percy Farm Solar 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-31.
- Queue ID
- ERCOT-24INR0020
- Location
- Matagorda, Texas
- Technology
- Solar
- Developer
- Percy Farm Solar 1, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 8123 Blessing - 5915 STP
What stands out
1
Percy Farm Solar is a 199 MW Solar project in Texas with status active.
2
Percy Farm Solar 1, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-05-31.
Market and operating context
- Queue date
- 2021-03-16
- Proposed COD
- 2029-05-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.