103 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-09-13
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Pequin Energy Storage is a 103 MW Battery project in Texas, currently active.

Pequin Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-13.

Queue ID
ERCOT-23INR0194
Location
Brazoria, Texas
Technology
Battery
Developer
Pequin Energy Storage, LLC
Market / region
ERCOT
Point of interconnection
39500 TN West Columbia 138kV

What stands out

1

Pequin Energy Storage is a 103 MW Battery project in Texas with status active.

2

Pequin Energy Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-13.

Market and operating context

Queue date
2021-01-25
Proposed COD
2027-09-13
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pequin Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0194
LocationBrazoria, Texas
TechnologyBattery
DeveloperPequin Energy Storage, LLC
Market / regionERCOT
Point of interconnection39500 TN West Columbia 138kV
Queue date2021-01-25
Proposed COD2027-09-13