200 MW
Proposed capacity
active
Current status
Solar
Technology
Southeast
Market / region
2024-08-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Pepper Hammock Solar is a 200 MW Solar project in Georgia, currently active.

The reported queue phase is Facility Study. Proposed COD is 2024-08-30.

Queue ID
GTC-GI-166
Location
Glynn, Georgia
Technology
Solar
Market / region
Southeast
Point of interconnection
Offerman 230 kV -Thalmann 230 kV TL

What stands out

1

Pepper Hammock Solar is a 200 MW Solar project in Georgia with status active.

2

The reported queue phase is Facility Study; proposed COD is 2024-08-30.

Market and operating context

Queue date
2022-06-21
Proposed COD
2024-08-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pepper Hammock Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-166
LocationGlynn, Georgia
TechnologySolar
Market / regionSoutheast
Point of interconnectionOfferman 230 kV -Thalmann 230 kV TL
Queue date2022-06-21
Proposed COD2024-08-30