Penascal II Wind Project LLC is a 202 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.
Penascal II Wind Project LLC is reported in Texas since 2010 under Avangrid Power LLC. Available operating and financial measures include 16.2% capacity factor and 286 GWh annual generation; $1895/kW reported CapEx.
- Location
- Kenedy, Texas
- Technology
- Onshore Wind Turbine
- Owner / parent
- Avangrid Power LLC
- Operator
- Avangrid Power LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 57095
What stands out
Penascal II Wind Project LLC is a 202 MW Onshore Wind Turbine asset in Texas with status Operating.
Latest annual operating measures report 16.2% capacity factor and 286 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #97 of 252
- National rank
- #288 of 1,442
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.