Briefing/projectactive
Pelham Solar is a 120 MW Solar project in Georgia, currently active.
The reported queue phase is System Impact Study. Proposed COD is 2025-11-30.
- Queue ID
- GTC-GI-182
- Location
- Charlton, Georgia
- Technology
- Solar
- Market / region
- Southeast
- Point of interconnection
- Folkston - St. George 115 kV TL
What stands out
1
Pelham Solar is a 120 MW Solar project in Georgia with status active.
2
The reported queue phase is System Impact Study; proposed COD is 2025-11-30.
Market and operating context
- Queue date
- 2023-09-20
- Proposed COD
- 2025-11-30
- IA status
- System Impact Study
- Study phase
- System Impact Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.