Pejepscot Hydroelectric Project is a 14 MW Conventional Hydroelectric asset in ISO New England, currently Operating.
Pejepscot Hydroelectric Project is reported in Maine since 1987 under Topsham Hydro Partners. Available operating and financial measures include 41.0% capacity factor and 49 GWh annual generation; $2294/kW reported CapEx.
- Location
- Sagadahoc, Maine
- Technology
- Conventional Hydroelectric
- Owner / parent
- Topsham Hydro Partners
- Operator
- Topsham Hydro Partners
- Grid
- ISO New England
- Plant ID
- 50758
What stands out
Pejepscot Hydroelectric Project is a 14 MW Conventional Hydroelectric asset in Maine with status Operating.
Latest annual operating measures report 41.0% capacity factor and 49 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #12 of 48
- National rank
- #574 of 1,462
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.