191 MW
Proposed capacity
active
Current status
Wind+Battery
Technology
ERCOT
Market / region
2027-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Pecos Wind is a 191 MW Wind+Battery project in Texas, currently active.

Midnight Energy Center, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-30.

Queue ID
ERCOT-27INR0510
Location
Pecos, Texas
Technology
Wind+Battery
Developer
Midnight Energy Center, LLC
Market / region
ERCOT
Point of interconnection
Tap 345 kV 60404 Solstice (SOLSTICE7A) – 76002 Bakersfield (L_BAKERS5_1Y) CKT 2

What stands out

1

Pecos Wind is a 191 MW Wind+Battery project in Texas with status active.

2

Midnight Energy Center, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-30.

Market and operating context

Queue date
2025-07-07
Proposed COD
2027-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pecos Wind — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0510
LocationPecos, Texas
TechnologyWind+Battery
DeveloperMidnight Energy Center, LLC
Market / regionERCOT
Point of interconnectionTap 345 kV 60404 Solstice (SOLSTICE7A) – 76002 Bakersfield (L_BAKERS5_1Y) CKT 2
Queue date2025-07-07
Proposed COD2027-09-30