Pecan Row Landfill To Electric Facility is a 6 MW Landfill Gas asset in Georgia, currently Operating.
Pecan Row Landfill To Electric Facility is reported in Georgia since 1977 under Energy Developments, Inc d/b/a EDL. Available operating and financial measures include 54.3% capacity factor and 30 GWh annual generation; $3495/kW reported CapEx.
- Location
- Lowndes, Georgia
- Technology
- Landfill Gas
- Owner / parent
- Energy Developments, Inc d/b/a EDL
- Operator
- Energy Developments, Inc d/b/a EDL
- Grid
- Southern Company Services, Inc. - Trans
- Plant ID
- 59221
What stands out
Pecan Row Landfill To Electric Facility is a 6 MW Landfill Gas asset in Georgia with status Operating.
Latest annual operating measures report 54.3% capacity factor and 30 GWh annual generation.
Available financial measures include $3495/kW CapEx.
Market and operating context
- Balancing authority
- Southern Company Services, Inc. - Trans
- NERC region
- SERC
- State rank
- #6 of 10
- National rank
- #68 of 282
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.