Query
Parula Energy Center
Type
Entity Briefing
Entity
Parula Energy Center
Generated
2026-10-13T02:03:55.081Z

Briefing on Parula Energy Center

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
251 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Parula Energy Center is a 251 MW Battery project in Texas, currently active.

Parula Energy Center is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-30.

Queue ID
ERCOT-27INR0252
Location
Austin, Texas
Technology
Battery
Developer
Parula Energy Center
Market / region
ERCOT
Point of interconnection
7287 Bellville North 138kV

What stands out

1

Parula Energy Center is a 251 MW Battery project in Texas with status active.

2

Parula Energy Center is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-09-30.

Market and operating context

Queue date
2024-05-20
Proposed COD
2027-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Parula Energy Center — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0252
LocationAustin, Texas
TechnologyBattery
DeveloperParula Energy Center
Market / regionERCOT
Point of interconnection7287 Bellville North 138kV
Queue date2024-05-20
Proposed COD2027-09-30