Query
Pardee
Type
Entity Briefing
Entity
Pardee
Generated
2026-10-17T07:37:16.953Z

Briefing on Pardee

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
24 MW
Capacity
Operating
Current status
1930
Operating since
3
Generators
55.0%
Capacity factor
118 GWh
Annual generation
Briefing/plantOperating

Pardee is a 24 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Pardee is reported in California since 1930 under East Bay Municipal Util Dist - (CA). Available operating and financial measures include 55.0% capacity factor and 118 GWh annual generation; $2294/kW reported CapEx.

Location
Calaveras, California
Technology
Conventional Hydroelectric
Owner / parent
East Bay Municipal Util Dist - (CA)
Operator
East Bay Municipal Util Dist - (CA)
Grid
CAISO (California)
Plant ID
376

What stands out

1

Pardee is a 24 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 55.0% capacity factor and 118 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

4

Latest linked story: “Lower Mokelumne River Project Relicensing (FERC)” (East Bay Municipal Utility District (EBMUD), 2023-11-14).

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#89 of 247
National rank
#451 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.