Briefing/projectactive
Panhandle Flagship Solar 2 is a 304 MW Solar+Battery project in Texas, currently active.
Panhandle Solar Group Operating Company LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2031-06-30.
- Queue ID
- ERCOT-27INR0023
- Location
- Hutchinson, Texas
- Technology
- Solar+Battery
- Developer
- Panhandle Solar Group Operating Company LLC
- Market / region
- ERCOT
- Point of interconnection
- 345 kV Railhead Substation (RAILHEAD #79005). Station 2 (27INR0023) connects to Station 1 (27INR0022 & 27INR0025) via a 4.9 mile internal tie line. Station 1 (27INR0022 & 27INR0025) connects to POIB via 22.5 mile tie-line
What stands out
1
Panhandle Flagship Solar 2 is a 304 MW Solar+Battery project in Texas with status active.
2
Panhandle Solar Group Operating Company LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2031-06-30.
Market and operating context
- Queue date
- 2023-03-13
- Proposed COD
- 2031-06-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.