Query
Palmer Solar
Type
Entity Briefing
Entity
Palmer Solar
Generated
2026-10-19T08:50:56.326Z

Briefing on Palmer Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
60 MW
Capacity
Operating
Current status
2020
Operating since
1
Generators
26.7%
Capacity factor
140 GWh
Annual generation
Briefing/plantOperating

Palmer Solar is a 60 MW Solar Photovoltaic asset in Colorado, currently Operating.

Palmer Solar is reported in Colorado since 2020 under Duke Energy. Available operating and financial measures include 26.7% capacity factor and 140 GWh annual generation; $13.8/MWh reported energy value.

Location
El Paso, Colorado
Technology
Solar Photovoltaic
Owner / parent
Duke Energy
Operator
Duke Energy Renewables Services
Grid
Western Area Power Administration - Rocky Mountain Region
Plant ID
62495

What stands out

1

Palmer Solar is a 60 MW Solar Photovoltaic asset in Colorado with status Operating.

2

Latest annual operating measures report 26.7% capacity factor and 140 GWh annual generation.

3

Available financial measures include $13.8/MWh energy value.

Market and operating context

Balancing authority
Western Area Power Administration - Rocky Mountain Region
NERC region
WECC
State rank
#23 of 191
National rank
#1332 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.