Query
Palm Springs DAC PV
Type
Entity Briefing
Entity
Palm Springs DAC PV
Technology
solar
Generated
2026-10-17T09:19:25.533Z

Briefing on Palm Springs DAC PV

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
2021
Operating since
2
Generators
Briefing/plantOperating

Palm Springs DAC PV is a 2 MW Batteries asset in CAISO (California), currently Operating.

Palm Springs DAC PV is reported in California since 2021 under Palm Springs USD. Available operating and financial measures include $1796/kW reported CapEx.

Location
Riverside, California
Technology
Batteries, Solar Photovoltaic
Owner / parent
Palm Springs USD
Operator
Palm Springs USD
Grid
CAISO (California)
Plant ID
69288

What stands out

1

Palm Springs DAC PV is a 2 MW Batteries asset in California with status Operating.

2

Available financial measures include $1796/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
State rank
#643 of 992
National rank
#6111 of 7,971

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Palm Springs DAC PV — verified asset snapshot

FieldValue
LocationRiverside, California
TechnologyBatteries, Solar Photovoltaic
Owner / parentPalm Springs USD
OperatorPalm Springs USD
GridCAISO (California)
Plant ID69288
ISO / marketCAISO (California)
State rank#643 of 992