Palm Beach Renewable Energy Facility 2 is a 96 MW Municipal Solid Waste asset in Florida, currently Operating.
Palm Beach Renewable Energy Facility 2 is reported in Florida since 2015 under Solid Waste Authority of Palm Beach County. Available operating and financial measures include 62.5% capacity factor and 526 GWh annual generation; $1531/kW reported CapEx.
- Location
- Palm Beach, Florida
- Technology
- Municipal Solid Waste
- Owner / parent
- Solid Waste Authority of Palm Beach County
- Operator
- Solid Waste Authority of Palm Beach Co
- Grid
- Florida Power & Light Company
- Plant ID
- 57898
What stands out
Palm Beach Renewable Energy Facility 2 is a 96 MW Municipal Solid Waste asset in Florida with status Operating.
Latest annual operating measures report 62.5% capacity factor and 526 GWh annual generation.
Available financial measures include $1531/kW CapEx.
Latest linked story: “Palm Beach County, Florida, approves $1.5B plan for second incinerator” (Waste Dive, 2025-10-09).
Market and operating context
- Balancing authority
- Florida Power & Light Company
- NERC region
- SERC
- State rank
- #1 of 9
- National rank
- #4 of 55
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.