Query
Palm Beach Renewable Energy Facility 2
Type
Entity Briefing
Entity
Palm Beach Renewable Energy Facility 2
Generated
2026-10-17T06:44:31.398Z

Briefing on Palm Beach Renewable Energy Facility 2

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
96 MW
Capacity
Operating
Current status
2015
Operating since
1
Generators
62.5%
Capacity factor
526 GWh
Annual generation
Briefing/plantOperating

Palm Beach Renewable Energy Facility 2 is a 96 MW Municipal Solid Waste asset in Florida, currently Operating.

Palm Beach Renewable Energy Facility 2 is reported in Florida since 2015 under Solid Waste Authority of Palm Beach County. Available operating and financial measures include 62.5% capacity factor and 526 GWh annual generation; $1531/kW reported CapEx.

Location
Palm Beach, Florida
Technology
Municipal Solid Waste
Owner / parent
Solid Waste Authority of Palm Beach County
Operator
Solid Waste Authority of Palm Beach Co
Grid
Florida Power & Light Company
Plant ID
57898

What stands out

1

Palm Beach Renewable Energy Facility 2 is a 96 MW Municipal Solid Waste asset in Florida with status Operating.

2

Latest annual operating measures report 62.5% capacity factor and 526 GWh annual generation.

3

Available financial measures include $1531/kW CapEx.

4

Latest linked story: “Palm Beach County, Florida, approves $1.5B plan for second incinerator” (Waste Dive, 2025-10-09).

Market and operating context

Balancing authority
Florida Power & Light Company
NERC region
SERC
State rank
#1 of 9
National rank
#4 of 55

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.